The PNIEC ( Spanish Long Term Energy Plan) sets out to reach 160 GW of renewables by 2030, including 62 GW of wind and 76 GW of PV. Currently, only 6.4 GW of the 53.6 GW in the pipeline have a construction permit, highlighting the challenges in achieving these objectives.